7-ELEVEN: NEW TO INDUSTRY (NTI)

MES completes fueling system installation for a new 7-Eleven location.

Services Provided:

  • Underground Storage Tank (UST) Installation
  • Fueling Product Piping Installation
  • Dispenser Installation
  • Canopy Footing Installation
  • Inventory Management Control Systems Installation
  • Monitoring & Leak Detection System Installation

This past January, 7-Eleven opened a new location thanks in part to our incredible MES team who worked tirelessly to complete this project. Our role in the construction of this new-to-industry (NTI) location was focused on the fueling system itself. We were specifically contracted to install two 15,000 gallon underground storage tanks (UST), the associated piping, 6 dispensers, and canopy footings.

Services Provided:

  • Underground Storage Tank (UST) Installation
  • Fueling Product Piping Installation
  • Dispenser Installation
  • Canopy Footing Installation
  • Inventory Management Control Systems Installation
  • Monitoring & Leak Detection System Installation

This past January, 7-Eleven opened a new location in Danbury, CT thanks in part to our incredible MES team who worked tirelessly to complete this project. Our role in the construction of this new-to-industry (NTI) location was focused on the fueling system itself. We were specifically contracted to install two 15,000 gallon underground storage tanks (UST), the associated piping, 6 dispensers, and canopy footings.

Challenges

Prior to starting the job, we were made aware that this location had a highwater table. Knowing this, we were able to plan accordingly and ensure our crews were prepared to dewater the site in order to install the tanks. However, what we weren’t able to plan for was the large rainstorm that resulted in massive amounts of flooding throughout the area.

Process

Our crews had to work around the clock over a weekend in order to ensure the pumps kept running and we could return to work once the storm and flooding cleared. After successfully controlling the water, we were able to continue the pump and tank construction and finish ahead of schedule. This project was successfully completed thanks to our dedicated pump and tank construction crew, PALCON Inc., and 7-Eleven’s continuous support.

Challenges

Prior to starting the job, we were made aware that this location had a highwater table. Knowing this, we were able to plan accordingly and ensure our crews were prepared to dewater the site in order to install the tanks. However, what we weren’t able to plan for was the large rainstorm that resulted in massive amounts of flooding throughout the area.

Process

Our crews had to work around the clock over a weekend in order to ensure the pumps kept running and we could return to work once the storm and flooding cleared. After successfully controlling the water, we were able to continue the pump and tank construction and finish ahead of schedule. This project was successfully completed thanks to our dedicated pump and tank construction crew, PALCON Inc., and 7-Eleven’s continuous support.

START YOUR PROJECT WITH US

At MES we are inspired by challenges of every scale; working WITH our clients is how we ensure their needs are fulfilled. We pride ourselves in our ability to provide the most advanced technologies for accurate results with minimal disruption, exceeding our clients expectations time and again.